Baselinecast

Baseline and earned-value control tower

Locks WBS cost/schedule baselines, captures progress only from evidenced facts, computes CPI/SPI and drafts variance narratives that cite those facts.

DemoDeployment-Ready FoundationfazeZERO VerifiedProprietaryAEC & Built EnvironmentProject Controls & EVM

Last verified 15 Sept 2026 · Updated 23 Sept 2026 · Metadata v5

Configure this applicationRequest a demo

Configuration + implementation engagement

Problem

Monthly EVM packs are assembled by hand from P6, Excel and Power BI that disagree, with progress percent typed from optimism.

Outcome

Trusted period packs — approved baseline, evidenced progress, deterministic indices and cited variance narratives.

Who uses it

  • Finance Analyst
  • Operations Analyst
  • Portfolio Manager
  • COO

Key capabilities

  • Approved baseline versions

    Included

    WBS cost/schedule targets with reason, approver and before/after snapshot.

    Domain: baselines

  • Evidenced progress capture

    Included

    Progress enters only via attested facts — never model-invented percent complete.

    Domain: progress

  • Deterministic EVM metrics

    Included

    CPI, SPI, PV, EV, AC and configured EAC from baseline + progress + actuals.

    Domain: metrics

  • Cited variance narratives

    AI-assistedIncluded

    AI drafts that must cite fact ids; uncited sentences rejected.

    Domain: narratives

  • Immutable period packs

    Included

    Month-end snapshot of metrics, narrative and exports.

    Domain: period-packs

Typical workflow

Period controls close

Trigger: Project controls opens a reporting period against an approved baseline

  1. Task

    Stage 1: Confirm baseline version

    Project controls manager

  2. Task

    Stage 2: Capture evidenced progress

    Cost engineer

  3. Automated

    Stage 3: Compute EVM metrics

    System

  4. AI-assisted

    Stage 4: Draft variance narrative

    System

  5. Human checkpoint

    Stage 5: Approve period pack

    Project controls manager

Task Automated AI-assisted Human checkpoint Decision

About this foundation

Baselinecast is the controls truth layer between execution tools and executive reporting. Progress percent is never generated by a language model — it enters only through ProgressCapture records with provenance. CPI, SPI and related metrics are deterministic computations; AI may only draft variance narratives from a closed fact pack. Crewspan supplies field facts; Awardbind emits commercial events; Quantspan prices the bid; Baselinecast owns baselines, EVM and period packs.

  • Mashroo

    Government portfolio and program delivery management

    • Addresses the same problem: Poor Visibility, Fragmented Systems
    • Shared capabilities: Forecasting, Reporting, Decision Support
  • OpsDeck Aviation

    Airline operations disruption management

    • Addresses the same problem: Poor Visibility, Fragmented Systems
    • Shared capabilities: Forecasting, Monitoring, Decision Support
  • Vantage Operator Control

    Virtual asset operator control plane

    • Addresses the same problem: Weak Evidence, Fragmented Systems
    • Shared capabilities: Reporting, Evidence Management
  • Aetherlab

    Enterprise AI model lifecycle control plane

    • Addresses the same problem: Weak Evidence, Fragmented Systems
    • Shared capabilities: Monitoring, Evidence Management
  • Awardbind

    Construction commercial and award administration

    • Addresses the same problem: Weak Evidence
    • Shared capabilities: Reporting, Evidence Management
  • SOC Pilot

    Security operations alert triage and investigation

    • Addresses the same problem: Weak Evidence, Fragmented Systems
    • Shared capabilities: Monitoring
Configure this application